1. Safety
- No safety issues reported this week.
- Safety rewards for July are in progress and will be announced next week.
2. Product Quality & Engineering Updates
- A design issue was identified on the Papa Grizzly Rock Screen model: the current hook design lacks adequate gap, allowing rocks to wedge and jam the screen.
- Redesign is being planned, focusing on the 3” screen models.
- Internal team will collaborate on future builds to address this improvement.
- Redesign is being planned, focusing on the 3” screen models.
- Field performance feedback: A Papa Grizzly unit is withstanding oversized material use in Moab and performing well under heavy-duty conditions.
3. Production, Equipment & Inventory
-
Photo & Video Documentation:
- Product visuals are being expanded. All media will be stored in organized, product-specific folders for internal and marketing use.
- The 2-yard bedding box is gaining popularity for its compact design and utility in tight workspaces.
- Product visuals are being expanded. All media will be stored in organized, product-specific folders for internal and marketing use.
-
C&T Plasma Table:
- Shipping has been paid; awaiting shipment confirmation.
- Some attachment plate CAD drawings are incomplete and will be redrawn to match current fabrication needs.
- Shipping has been paid; awaiting shipment confirmation.
-
Fulcrum ERP Workaround:
- A temporary manual entry method is in use while a new value feature is under development.
- A temporary manual entry method is in use while a new value feature is under development.
-
Bird Deterrent Strategies:
- The team is evaluating high-quality netting and other solutions to manage ongoing bird issues under facility awnings without causing harm.
4. Team & Sales Updates
-
Sales Performance:
- July sales surpassed break-even point
- July sales surpassed break-even point
-
Lead Generation & Attribution:
- Outreach via CDOT mailing lists generated strong leads, including interest from regional infrastructure projects.
- Direct product deliveries and printed brochures are helping to strengthen sales relationships.
- Outreach via CDOT mailing lists generated strong leads, including interest from regional infrastructure projects.
-
Quoting Best Practices:
- All quotes must include accurate shipping charges, especially for custom items that override presets.
- Ongoing training is underway to ensure accurate quoting.
- All quotes must include accurate shipping charges, especially for custom items that override presets.
-
SKU Structure & File Management:
- SKUs follow a standardized format:
[Product Line][Model Number]-[Top/Bottom Dimensions][Color][Modifier]
- Shared folders are organized by product family prefix (e.g., B1 for 1 CY Bedding Box).
- All new products are to be added to the R&D folder and assigned a SKU before moving to active production.
- SKUs follow a standardized format:
5. Project Updates
-
Roll-Off Concrete Washout Tub:
- Drawings are underway; final design pending due to drafter availability.
- Drawings are underway; final design pending due to drafter availability.
-
Engineered Trench Box:
- Design is moving forward; engineering not required unless exceeding 20 feet in depth.
- Team is evaluating the long-term potential of trench box rentals as an additional revenue stream.
- Design is moving forward; engineering not required unless exceeding 20 feet in depth.
6. Miscellaneous Notes
- A Mama Grizzly Rock Screen with a 1” screen was allocated for marketing purposes. Billing and shipping logistics are being finalized.
- Team members may support an upcoming mine site project; materials for trench box installation are prepped.
- Bird deterrent strategies discussed include motion-sensor owls, reflective devices, and improved lighting to discourage nesting.